MAR 2020 - Maintenance Shop
COMPLETE -- This project consisted of the donation and relocationn of a 20' x 24' steel building on a concrete slab to be used as the maintenance shop for the camp's power equipment.
COMPLETE -- This project consisted of the donation and relocationn of a 20' x 24' steel building on a concrete slab to be used as the maintenance shop for the camp's power equipment.
COMPLETE -- This project consisted of drilling a well to provide fresh water to the camp. Once it was in, we got an unexpected surprise -- the water is incredibly clean and fresh, with no sulphur.
COMPLETE -- This project consisted on the placment of a transformer and installation of 600 amp service into the camp.
COMPLETE -- The 20' x 40' Main Pavilion was the first structure erected in the camp. For the first year of the camp, it was our base of operations and served as our primary gathering place, shelter and equipment and material storage area.
COMPLETE -- This project, donated by an Eagle Scout, consisted of the installation of a 30' x 50' steel building on a concrete slab, to be used as the main storage area for the camp as well as an emergency storm shelter rated for up to Category 3 hurricane winds.